He revised the PVC pipe exhaust with the radiant heat boiler on the roof where by the original plumber had didn't glue any in the PVC pipe joints causing leaking into the boiler unit inside the mechanical space. He revised a bathtub drain that was mounted without having a p https://zanderapsyb.blog2freedom.com/34770036/the-definitive-guide-to-hot-water-system-installation